Workshop Fabrication
Workshop Fabrication Case Studies
GF Engineering has three different workshops that enable us to work on three different aspects of projects at the same time. For example - We are able to work on structural steel in one workshop, pipe spooling in the second and installation into modules or exotic spooling in the third.
Avoiding contamination between stainless & carbon steels is a must. Having segregated workshops ensures this process is achieved. We also have 9000m2 of laydown area to receive free issue pipe & fittings in which we can store over the period of a project. The large laydown area also allows us complete Non-Destructive Testing, hydrotesting & loading out on site safely.